Herhangi birini doğrudan ChatGPT, Claude ya da Gemini’ye kopyalayın, sonra köşeli parantezleri kendi bilgilerinizle değiştirin.
9 kopyala-yapıştır prompt
1Generate a Shift Handoff Report
Act as a Plant Production Supervisor. Generate a concise shift handoff report for the end of the day shift on [[Date]]. Use the following template and information: - **Shift:** Day Shift (07:00 - 15:00) - **Production Line:** [[e.g., CNC Milling Line 3]] - **Production Target (Units):** [[e.g., 800]] - **Actual Production (Units):** [[e.g., 752]] - **Downtime Events:** - [Event 1: e.g., 10:15 - 10:45 (30 min), Machine M-301, Jammed conveyor belt, Cleared by maintenance tech John S.] - [Event 2: e.g., 14:00 - 14:20 (20 min), Machine M-305, Coolant pressure alarm, Topped up by operator.] - **Quality Issues:** - [Issue 1: e.g., 5 units of Part #789-C failed dimensional check at 11:30. Quarantined and documented in NCR #2026-09-03-A.] - **Safety Incidents/Near Misses:** - [[Incident: e.g., None.]] - **Maintenance Actions Required for Next Shift:** - [Action 1: e.g., Monitor coolant pressure on M-305. Maintenance has been notified to check for a slow leak.] - **Key Priorities for Night Shift:** - [Priority 1: e.g., Catch up on the 48-unit production deficit from the downtime on M-301.] - [Priority 2: e.g., Perform first-off inspection for the new batch of raw material arriving at 16:00.] Format the output as a clean, scannable report using markdown headings.
Generate a 15-minute daily production meeting agenda for tomorrow, [[Date]]. The focus is on reviewing yesterday's performance and setting today's priorities for the assembly department. Include these specific talking points: 1. **Safety Minute:** A brief reminder about [[e.g., proper lifting techniques]]. 2. **Performance Review (Previous Day):** - OEE: [[e.g., 78%]] - Production Target vs. Actual: [[e.g., 1200 vs. 1150]] - Key Downtime Reason: [[e.g., Feeder misalignment on Line 2]] 3. **Today's Priorities:** - Key Production Goal: [[e.g., 1250 units, including recovery]] - Focus Area: [[e.g., Line 2 stability and monitoring]] - Known Changeovers: [[e.g., Product B to Product C on Line 4 at 10:00 AM]] 4. **Resource Allocation:** - Staffing issues or changes: [[e.g., Mark is out sick, float operator will cover Line 3]] 5. **Open Floor (2 min):** For immediate roadblocks or questions. Structure the output with clear headings and estimated timings for each section.
Act as a Quality Engineer. Draft a Non-Conformance Report (NCR) based on the following details. Structure it for an ISO 9001 compliant system. - **Part Number:** [[e.g., F-451-B]] - **Part Name:** [[e.g., Bearing Housing]] - **Quantity Affected:** [[e.g., 32]] - **Date of Discovery:** [[e.g., 2026-09-03]] - **Discovered By:** [[e.g., Operator, Jane Doe]] - **Location/Process:** [[e.g., Final Inspection, CMM Station 2]] - **Description of Non-Conformance:** [e.g., The internal bore diameter measures 50.15mm +/- 0.05mm. The specification is 50.00mm +/- 0.05mm. The parts are oversized.] - **Immediate Action Taken:** [e.g., All 32 parts were segregated and moved to the quarantine cage. Production on the responsible machine (CNC Lathe #5) was halted pending investigation.] Generate a formal NCR document including fields for: - NCR Number (use format NCR-YYYY-MM-DD-X) - Part Information - Description of Non-conformance - Containment Actions - Root Cause Investigation (leave blank) - Corrective Action Plan (leave blank) - Verification of Effectiveness (leave blank) - Disposition (leave blank)
Generate a single-page Quality Alert to be posted on the production floor. The alert needs to be clear, visual, and easy to understand for all operators. - **Part Number:** [[e.g., P-9980]] - **Issue:** [[e.g., Surface scratches found near the mounting holes.]] - **Inspection Method:** [e.g., Visually inspect each part under the task light before packing.] - **Good Part Example Description:** [[e.g., Smooth, uniform surface with no visible marks.]] - **Bad Part Example Description:** [[e.g., Visible linear scratches, feels rough to the touch.]] - **Action for Bad Parts:** [[e.g., Place in the red bin at your station. Do not pack.]] - **Date of Alert:** [[e.g., 2026-09-03]] Use simple language, bullet points, and clear headings. Include placeholders like `[[IMAGE OF GOOD PART]]` and `[[IMAGE OF BAD PART]]`.
5Generate a Machine-Specific Lockout/Tagout (LOTO) Procedure
Act as a Safety Engineer. Create a machine-specific Lockout/Tagout (LOTO) procedure compliant with OSHA standard 29 CFR 1910.147. - **Equipment Name:** [[e.g., ACME Model 5 CNC Press Brake]] - **Equipment ID:** [[e.g., PB-07]] - **Location:** [[e.g., Fabrication Bay 2]] - **Energy Sources to Isolate:** 1. **Electrical:** Main disconnect (Panel P-11, Breaker #3, 480V). Located on the wall behind the machine. 2. **Hydraulic:** Ball valve on the main hydraulic pump unit. Located inside the rear access panel. Requires bleeding pressure at test port TP-1 after closing. 3. **Pneumatic:** Gate valve on the air supply line above the machine. Requires releasing trapped air via the purge valve next to the FRL unit. Generate a step-by-step procedure including: 1. Purpose 2. Required PPE 3. Shutdown Sequence 4. Energy Isolation Sequence 5. Verification of Zero Energy State 6. Procedure for Restoring to Service Use clear, numbered steps and explicit warnings.
Create a Job Safety Analysis (JSA) for the task of 'Changing the blade on a vertical band saw'. Identify the basic job steps, potential hazards for each step, and the recommended safe job procedures to mitigate those hazards. Use a three-column table format. **Task:** Changing the blade on a vertical band saw **Location:** Machine Shop **Job Steps to Analyze:** 1. Preparing for the task. 2. Removing the old blade. 3. Installing the new blade. 4. Testing and cleanup. **Potential Hazards to Consider:** - Unexpected startup (electrical) - Stored energy in blade tension - Lacerations from sharp blade - Pinch points in rollers and guides - Eye injury from flying debris
Act as a Lean Manufacturing Analyst. Calculate the Overall Equipment Effectiveness (OEE) and identify the top loss categories based on the following single-shift data for Production Line 1. - **Shift Length:** 8 hours (480 minutes) - **Scheduled Breaks:** Two 15-minute breaks (30 minutes total) - **Unplanned Downtime:** 47 minutes - **Ideal Cycle Time:** 60 seconds per unit - **Total Units Produced:** 350 - **Scrapped Units:** 12 Calculate the three OEE components: 1. **Availability:** (Run Time / Planned Production Time) 2. **Performance:** (Total Units * Ideal Cycle Time) / Run Time 3. **Quality:** (Good Units / Total Units Produced) Then, calculate the final OEE score (Availability * Performance * Quality) and state the primary loss factor (the component with the lowest score). Show your calculations.
Act as a Quality Manager. Perform a 5 Whys root cause analysis on the following problem statement. For each "Why?", provide a logical answer that drills down further. **Problem Statement:** The new batch of Part #XYZ-123 has a high rate of surface finish defects. **Known Information:** The defect is a "chatter" mark originating from the final milling operation on CNC Machine #8. Start with the problem and ask "Why?" five times.
Generate a template for an 8D (Eight Disciplines) Corrective Action Report. The report is for the following problem: "Customers are reporting premature failure of the seal in our hydraulic pump assembly (Part #HP-500)." Create a structure with all 8 disciplines as H3 headings. For D1 through D3, pre-fill the sections based on the information below. Leave D4-D8 as "To be determined." - **Team Members (D1):** John Smith (Quality Eng.), Sarah Lee (Production Sup.), David Chen (Design Eng.) - **Problem Description (D2):** The Buna-N O-ring seal (Part #S-102) in hydraulic pump assembly HP-500 is exhibiting compression set and cracking after an estimated 500 hours of field use, well below the 2000-hour design life. This leads to external hydraulic fluid leaks. - **Interim Containment Action (D3):** All existing inventory of HP-500 pumps (both finished goods and WIP) will be placed on quality hold. A 100% inspection and replacement of the S-102 seal with a higher-grade Viton seal (Part #S-103) will be implemented for all quarantined stock and new production, effective immediately.
Dört adım, yaklaşık bir dakika. Yapıyı prompt verir, ayrıntıları siz.
1
Promptu seçin
Buradaki her prompt belirli bir iş için yazıldı — “uzman gibi davran” türü genel bir şablon değil. Başlıkları tarayın ve önünüzdeki işe uyanı alın.
2
Kopyalayıp yapıştırın
Kopyala’ya basın, tamamını ChatGPT, Claude, Gemini ya da zaten ödediğiniz asistana yapıştırın. Buradaki hiçbir şey tek bir modele bağlı değil.
3
Köşeli parantezleri doldurun
Göndermeden önce her [Köşeli parantezli alanı] kendi bilgilerinizle değiştirin. Kalite oradan gelir: yapıyı prompt verir, ayrıntıları siz.
4
Kaynak rehbere bakın
Her promptun altındaki “Kaynak” bağlantısı tam makaleyi açar: prompt neden böyle kurulmuş, neye karşı test edilmiş ve hangi araçlarla iyi çalışıyor.
Sık sorulanlar
Bu promptlardan birini gerçek bir işe yapıştırmadan önce akla gelen sorular.
Bu promptlar ücretsiz kullanılabilir mi?
Evet. Bu sayfadaki 9 promptun tamamı ChatGPT, Claude ve Gemini dahil herhangi bir yapay zekâ asistanıyla serbestçe kopyalanıp kullanılabilir. Yalnızca bu araçlardan birinde hesabınız olması yeterli.
üretim için bu promptları nasıl kullanırım?
Kopyala düğmesiyle prompt metnini alın, seçtiğiniz yapay zekâ asistanına yapıştırın ve göndermeden önce [Şehriniz] ya da [Şirket adı] gibi köşeli parantezli alanları kendi bilgilerinizle değiştirin.
Bu promptlar nereden geliyor?
Her prompt, test edilmiş bir Zekai rehberinden alındı. Her promptun altındaki “Kaynak” bağlantısı, mantığını ve nasıl test edildiğini anlatan tam makaleye gider.
Bu promptları değiştirebilir miyim?
Kesinlikle. Her birini başlangıç yapısı olarak görün: talimatları sıkılaştırın, kendi kısıtlarınızı ekleyin ve en iyi çıktıyı veren sürümü saklayın. Köşeli parantezler, her seferinde değişmesi gereken yerleri işaretler.
Diğer mesleklerin prompt kütüphaneleri
Aynı biçim, başka iş — üretim alanına en yakın olanlardan başlayarak.